Dag decided to help out too!
Saturday, February 28, 2015
Wings
Completed section 13 (almost)! Finished installing all the nutplates into the spar flanges and countersinking all the necessary holes. Fabricated and tapped the tie-down brackets, and installed the nutplates into it. Primed the spar flanges and tie down brackets. Only thing left to do is rivet and bolt them to the spar once the primer is dry!
Wednesday, February 25, 2015
Wings
Left wing: completed page 13-3 steps 4&6. Right wing: completed page 13-3 steps 2-3. We plan to stagger our work slightly to make efficient use of countersinks, drills, squeezers, etc. So far so good!
Monday, February 23, 2015
Sunday, February 22, 2015
Wings
Finished page 13-3 step 1, running #40 drill through all spar flange holes not already match-drilled.
Saturday, February 21, 2015
Wings
Completed page 13-2 steps 5-8. Fabricated wing box J-stiffeners and match-drilled them to the spar flanges. Started page 13-3 step 1.
Thursday, February 19, 2015
Wednesday, February 18, 2015
WE'RE BAAAAAACK!!!!
>>>Click here to continue to the blog<<<
Holy cow... it's February 2015?!?!?!? Where did all the time go? Why haven't we been building? Here's the short list of things that have occurred since the last build log entry:
- We built a new shed in the backyard (June 2014)
- Our sump pump quit on a Sunday during a rainstorm and flooded our basement (June 2014)
- The very next day (Monday) another storm knocked over a tree and tore down the shed we just built and broke out a window in the basement (June 2014)
- Mold discovered in basement, turning a big project into an even bigger one (July 2014)
- Complete basement renovation begins (July 2014)
- OSH '14 - can't miss that! (July 2014)
- Basement renovation continues. Decided to dig up part of the concrete and move a post that was always in the way... because why not? (August 2014)
- Completed my IFR training and obtained my Instrument rating (yay!) (September 2014)
- Flew to Washington DC and Buffalo NY in an Archer (September 2014)
- Basement renovation continues. Drywall installation, new lighting installed (October 2014)
- We built a bigger, stronger, better shed in the backyard (October 2014)
- Basement renovation continues. Installed a new drop ceiling in the basement (November 2014)
- Ended up in the ER after putting a drill through my left thumb while installing ceiling track. I don't have any idea why I was in such a hurry to be done with all of this! (November 2014)
- Basement is finally done! (December 2014)
- Scratch-built a giant custom 8' x 10' L-shaped desk with hutch to put in my office (December 2014)
- Trip to Florida for a friend's wedding and to visit my parents over the holidays (January 2015)
- Quit my job to work for a different company based out of the Washington DC area. It's a telecommuting job so we're still here in Iowa though... I'm really happy with it so far! (January 2015)
- Trip to Washington DC to begin training for my new job (January 2015)
HOPEFULLY.... this year will have fewer interruptions, starting now :-)
>>>Click here to continue to the blog<<<
Subscribe to:
Posts (Atom)