Thursday, April 10, 2014

Elevator Assembly Begins!

Assembled the elevator tip ribs and the front spars tonight. The tip ribs involved riveting the E-903 and E-904 tip rib halves together, and then laying the E-913 counterbalance skin over both parts. The final product looked like this:


The two elevator tip ribs after riveting the skins on

Inside view of the tip ribs after riveting together

Next, the hinge doubler plates were riveted to the elevator front spars, with the addition of a grounding nutplate next to the inboard plates:
Left inboard hinge doubler plate, with grounding nutplate off to the side

Both R and L elevator front spars, after assembly

No comments:

Post a Comment